Installing pipe and manifolds

From marking out to pressure testing

Preparation

  1. Clean the panels
    Clear the panels and channels of debris with a broom, vacuum or blower. A length of 15 mm conduit helps break away stuck material.
  2. Mark the pipe layout
    Mark the pipe paths from the pipe loop plan with a permanent marker or marking paint. Label turns, bury points, custom routes and each loop’s ID, and mark every floor penetration.
  3. Mark the manifolds
    Allow for the pipe runs and supply and return lines. Manifolds can mount upright, upside down or sideways, with connections on either side.
  4. Plan the runs back
    Use existing channels, rout custom channels, drill bury points (19 mm, at a low angle or as a 19 × 38 mm slot), or on a slab cut back the panels and fill level with a cement-based compound.

Laying the pipe

Tips

  • Uncoiler:
    Use a pipe uncoiler to avoid twists and kinks.
  • Temperature:
    Avoid laying pipe below 10 °C, when it stiffens.
  • Seat it:
    Seat the pipe with a rubber mallet (about 450 g) so it sits level and flush.
  • No adhesive:
    Never use silicone or adhesive in the channels.
  • Label:
    Tape the pipe ends and label each loop as you go.
  • Protect:
    Cover high-traffic areas with hardboard or floor protection board until the floor covering goes down.

Buried runs

  • Measure:
    Measure from each bury point to the manifold and mark that length on the pipe, with a little extra.
  • Feed through:
    Feed the pipe down the bury point to the mark, then lay it into the marked channels.
  • Under the floor:
    Run it back to the manifold, supported with clips or straps.
  • At the manifold:
    Bring supply and return up through the floor: supply at the back, return at the front.

Mounting

Mount on plywood or noggings, never straight to plasterboard. A 140 mm stud wall is easiest; some manifolds fit a 90 mm wall. Keep access with a cabinet door.

Connections

Cut the pipe square, chamfer it, fit the compression fittings and tighten onto the ports. No thread tape or jointing compound, and don’t overtighten.

Pressure testing

Your plumber tests to the Plumbing Code of Australia (AS/NZS 3500) and the pipe maker’s requirements, then keeps the system under pressure until the floor covering is down.

Repairs

Any repair to damaged pipe must be made by a licensed plumber, with a compression or press repair coupler. On Warmboard-R over a slab, only the slimmer press coupler fits within the panel depth.

Ready to plan your floor?

Send us your plans. Warmboard’s design team will draw your panel layout and pipe loop plan, and we’ll prepare your quote.